1 2 3 4 5 6 7 8

9 10 3

Chemist Kang Ding assembles and calibrates sensors before placing them at Rosebud to monitor temperatures and fluid chemistry at the vents. The sensors will remain at the site 13 days, until the end of the expedition.

« Previous | Next »

Chemist Kang Ding assembles and calibrates sensors before placing them at Rosebud to monitor temperatures and fluid chemistry at the vents. The sensors will remain at the site 13 days, until the end of the expedition. (Photo by Amy Nevala)

« Back to today's update